Doncaster Road, Woodlands
Overview
Client
Doncaster DMBC
Surface Size
3,389 SQM of Red laying alongside 3,277 of Black
Date
May 2022
Project Type
Highway Cycle Path
Project Details
Laying adjacent red/black tarmac to define pedestrian and cycle way
Materials Used: As specified by DMBC steelphalt colourphalt 6mm dense surface course with red pigmented pellets laid at 20mm thick to run alongside the standard 6mm dense surface course laid black footpath.